• 全国中文核心期刊
  • 中国科技核心期刊
  • 美国工程索引(EI)收录期刊
  • Scopus数据库收录期刊
Wang Baoyu, Cha Zhenheng, Qu Guangxing, Zhang Canfeng. Construction of the Impervious Wall by the Directional Jet Grouting Method[J]. Chinese Journal of Geotechnical Engineering, 1984, 6(6): 72-83.
Citation: Wang Baoyu, Cha Zhenheng, Qu Guangxing, Zhang Canfeng. Construction of the Impervious Wall by the Directional Jet Grouting Method[J]. Chinese Journal of Geotechnical Engineering, 1984, 6(6): 72-83.

Construction of the Impervious Wall by the Directional Jet Grouting Method

  • According to the technical requirement of the grout curtain to prevent the leakage in the foundation of dam, the special apparatus of the jet grouting method has been studied and equipped. In this paper, the technology to construct impervious wall by the jet grouting method is presented.This wall is in contact with the bedrock securely and its thickness is evenly and densely. The working speed is faster and construct cost is less.The set of the technique can be used to construct impervious curtain in the sand and gravelly soil foundation of lowhead dam and cut off wall. The technical parameters which have been obtained can be used to design and construction under suitable conditions.
  • loading

Catalog

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return