• 全国中文核心期刊
  • 中国科技核心期刊
  • 美国工程索引(EI)收录期刊
  • Scopus数据库收录期刊
ZHANG Yu-ting, KOU Xiao-qiang, ZUO Dian-jun, QIAO Xiao-li. Numerical simulation of disturbance characteristics and post-construction settlement caused by shield excavation in soft clay[J]. Chinese Journal of Geotechnical Engineering, 2013, 35(zk2): 753-757.
Citation: ZHANG Yu-ting, KOU Xiao-qiang, ZUO Dian-jun, QIAO Xiao-li. Numerical simulation of disturbance characteristics and post-construction settlement caused by shield excavation in soft clay[J]. Chinese Journal of Geotechnical Engineering, 2013, 35(zk2): 753-757.

Numerical simulation of disturbance characteristics and post-construction settlement caused by shield excavation in soft clay

  • Shield tunneling in soft clay will inevitably lead to the disturbance of soil strata. The deformation caused by this disturbance and the resulting persistent deformation have been the research focus. The finite difference program FLAC3D is empbyed to accurately simulate the excavation process in soft soils. The consolidation deformation caused by the excess pore water pressure dissipation in the tunnel after a considerable period of formation of tunnel stratum is a major factor. The consolidation settlement is about 15% of the total settlement. The scope of soil subsidence induced by the consolidation is 1.4 times that by traditional undrained analysis methods.
  • loading

Catalog

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return