• 全国中文核心期刊
  • 中国科技核心期刊
  • 美国工程索引(EI)收录期刊
  • Scopus数据库收录期刊
SU Bu-kun, JIANG Yan, YAO Li-na. Structure design of a metro station in Shenzhen using covered top-down construction method[J]. Chinese Journal of Geotechnical Engineering, 2012, 34(suppl): 728-734.
Citation: SU Bu-kun, JIANG Yan, YAO Li-na. Structure design of a metro station in Shenzhen using covered top-down construction method[J]. Chinese Journal of Geotechnical Engineering, 2012, 34(suppl): 728-734.

Structure design of a metro station in Shenzhen using covered top-down construction method

  • The whole construction process of a metro station is simulated by using the covered top-down construction method. The calculated results better reflect the inheritance relationship of the structural response between the construction stage and the servile stage, resulting in more accurate internal force and deformation. Besides, some new methods are also proposed to choose the lateral earth pressure and to modify the brace stiffness of the asymmetric structure. It is more reasonable to make the lateral earth pressure vary with the excavation process. It may provide reference for the design of the similar projects.
  • loading

Catalog

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return