• 全国中文核心期刊
  • 中国科技核心期刊
  • 美国工程索引(EI)收录期刊
  • Scopus数据库收录期刊
SHENG Chun-ling, LI Ren-min, WANG Shou-chao, CHEN Bo. Vertical adjustment method for soldier piles in top-down projects[J]. Chinese Journal of Geotechnical Engineering, 2012, 34(suppl): 595-597.
Citation: SHENG Chun-ling, LI Ren-min, WANG Shou-chao, CHEN Bo. Vertical adjustment method for soldier piles in top-down projects[J]. Chinese Journal of Geotechnical Engineering, 2012, 34(suppl): 595-597.

Vertical adjustment method for soldier piles in top-down projects

  • In top-down projects, due to the need to bear large vertical loads, the design and construction of soldier piles should strictly control their vertical degrees. The most commonly used column verticality control methods are reviewed, and their applicabilities, advantages and disadvantages are analyzed. At the same time, combined with a top-down project in Nanjing, the quality control system of steel pipe soldier piles is proposed. It will have guiding significance for the future construction of top-down projects.
  • loading

Catalog

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return