Citation: | CHEN Jian. Design and observation of deep excavation of eastern section of Slender West Lake tunnel[J]. Chinese Journal of Geotechnical Engineering, 2012, 34(suppl): 590-594. |
[1] |
中铁第四勘察设计院集团有限公司. 扬州瘦西湖隧道工程岩土工程勘察报告[R]. 扬州: 中铁第四勘察设计院集团有限公司, 2011. (China Railway Siyuan Survey and Design Group Co., Ltd., Geotechnical investigation report of the Yangzhou Slender West Lake tunnel[R]. Yangzhou: China Railway Siyuan Survey and Design Group Co. Ltd, 2011. (in Chinese))
|
[2] |
DBJ 08—61—97基坑工程设计规范[S]. 1997. (DBJ 08—61—97 Code for design of excavation engineering[S]. 1997. (in Chinese))
|
[3] |
刘国彬, 王卫东. 基坑工程手册[M]. 2版. 北京: 中国建筑工业出版社, 2009. (LIU Guo-bin, WANG Wei-dong. Excavation engineering handbook[M]. 2nd ed. Beijing: China Architecture & Building Press, 2009. (in Chinese))
|