• 全国中文核心期刊
  • 中国科技核心期刊
  • 美国工程索引(EI)收录期刊
  • Scopus数据库收录期刊
TANG Chuan-zheng, PENG Xiao-qiu, XIONG Qiu-mei, WANG Yue. Control and analysis of construction risk in excavations of stations of project stage No. 1 of Metro Line 3 in Wuhan[J]. Chinese Journal of Geotechnical Engineering, 2012, 34(suppl): 415-418.
Citation: TANG Chuan-zheng, PENG Xiao-qiu, XIONG Qiu-mei, WANG Yue. Control and analysis of construction risk in excavations of stations of project stage No. 1 of Metro Line 3 in Wuhan[J]. Chinese Journal of Geotechnical Engineering, 2012, 34(suppl): 415-418.

Control and analysis of construction risk in excavations of stations of project stage No. 1 of Metro Line 3 in Wuhan

  • Aiming at the technical characteristics of constructing excavations of stations of project stage No.1 of Metro Line 3 in Wuhan, combined with the geological and hydrogeological characteristics, the possible risks during construction process of excavations are analyzed, and the corresponding countermeasures are put forward so as to control and reduce the construction risks and to ensure the safety of excavation construction.
  • loading

Catalog

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return