YANG Zhi-hong, GUO Zhong-xian. Monitoring analysis of pre-stressed load of anchor cables for deep excavations[J]. Chinese Journal of Geotechnical Engineering, 2012, 34(suppl): 145-148.
Citation:
YANG Zhi-hong, GUO Zhong-xian. Monitoring analysis of pre-stressed load of anchor cables for deep excavations[J]. Chinese Journal of Geotechnical Engineering, 2012, 34(suppl): 145-148.
YANG Zhi-hong, GUO Zhong-xian. Monitoring analysis of pre-stressed load of anchor cables for deep excavations[J]. Chinese Journal of Geotechnical Engineering, 2012, 34(suppl): 145-148.
Citation:
YANG Zhi-hong, GUO Zhong-xian. Monitoring analysis of pre-stressed load of anchor cables for deep excavations[J]. Chinese Journal of Geotechnical Engineering, 2012, 34(suppl): 145-148.
Monitoring analysis of pre-stressed load of anchor cables for deep excavations
Based on systematical monitoring and analysis in practical projects, the loss of pre-stress after lock, load change of pre-stressed anchor cables in excavation and anchor cables during construction and lateral displacement of excavations are monitored and discussed. |