In situ test and construction of two-shot grouting for waterproof of man-hole-pile
-
Graphical Abstract
-
Abstract
Pile underpinning of Baihuo Plaza with great underpinning force and complex construction environment is one of the important parts of Shenzhen Metro project. The new underpinning piles are manholepiles. Because of high permeability and high confined water head in substrata, the cutoff grouting is very important to construction of manholepile.In situ test demonstrates that twoshot grouting method with water glass as main material can increase strength and decrease permeability of soil. The soil treated by this method can resist 0.3 MPa hydraulic fracture pressure and satisfy form a cutoff for the 20 m long pile. The seepageprevention technology with twocomponent polymer can prevent ground from swelling. This technology has some merits,such as simple,convenient,small volume of machines and no waste liquid,and is applicable to the construction spot with small space. The practice demonstrates that the grouting constructed by the technology can prevent water very well when manholes are dug.
-
-