• 全国中文核心期刊
  • 中国科技核心期刊
  • 美国工程索引(EI)收录期刊
  • Scopus数据库收录期刊
LUO Furong, GUO Bin. Construction technology of “tunneling and top-down method” at west Tian’anmen station in metro of Beijing[J]. Chinese Journal of Geotechnical Engineering, 2001, 23(1): 75-78.
Citation: LUO Furong, GUO Bin. Construction technology of “tunneling and top-down method” at west Tian’anmen station in metro of Beijing[J]. Chinese Journal of Geotechnical Engineering, 2001, 23(1): 75-78.

Construction technology of “tunneling and top-down method” at west Tian’anmen station in metro of Beijing

  • The construction method of “tunneling and top-down method” at west Tian′anmen station in metro of Beijing is introduced,and the measured settlement of ground surface,the measured pressure of surrounding rock and the internal force of strut are analyzed.This method,which combines“top-down method” and “shallow tunneling method”,possesses the advantages,such as economization, safety and rapid construction,ect,and it can be applied to large underground engineering in the flourishing area of city.
  • loading

Catalog

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return