Uplift test of foundation of electric power line tower in desert area
-
Graphical Abstract
-
Abstract
Model tests and field prototype tests have been carried out for the Dalate Fenzhen electric power tranmission line towers.Measured in these tests were soil stress,soil displacements and failure patterns.Failure mechanism and methods for calculating uplift bearing capacity and for controlling uplift displacement are suggested.
-
-