Citation: | GU Longsheng, ZHANG Yuting. Application of high-strain testing in large-diameter steel pipe pile project in Rudong sea area[J]. Chinese Journal of Geotechnical Engineering, 2024, 46(S1): 138-142. DOI: 10.11779/CJGE2024S10010 |
[1] |
LIU R, ZHOU L, LIAN J J, et al. Behavior of monopile foundations for offshore wind farms in sand[J]. Journal of Waterway Port Coastal and Ocean Engineering, 2015, 142(1): 04051010.
|
[2] |
码头结构设计规范: JTS 167—2018[S]. 北京: 人民交通出版社, 2018.
Wharf Structure Design Code: JTS 167—2018[S]. Beijing: China Communications Press, 2018. (in Chinese)
|
[3] |
API RP 2A-WSD. Recommended Practice for Planning, Designing, and Constructing Fixed Offshore Platforms- Working Stress Design[S]. API Recommended Practice 2A-WSD, 2010.
|
[4] |
倪敏. 大直径钢管桩竖向承载能力研究[D]. 天津: 天津大学, 2014.
NI Min. Research on Axial Load-Bearing Capacity of Large Diameter Pipe Piles[D]. Tianjin: Tianjin University, 2014. (in Chinese)
|
[5] |
刘润, 闫玥, 闫澍旺. 大直径超长桩后继打桩拒锤现象分析及单桩承载力计算[J]. 岩土力学与工程学报, 2008, 27(增刊2): 3459-3464. https://www.cnki.com.cn/Article/CJFDTOTAL-YSLX2008S2027.htm
LIU Run, YAN Yue, YAN Shuwang. Study on refusal of restarting of large diameter and deep penetration pile and bearing capacity calculation[J]. Chinese Journal of Rock Mechanics and Engineering, 2008, 27(S2): 3459-3464. (in Chinese) https://www.cnki.com.cn/Article/CJFDTOTAL-YSLX2008S2027.htm
|
[6] |
李飒, 李婷婷, 张树德, 等. 基于实测数据的桩基承载力恢复计算与分析[J]. 工程力学, 2018, 35(6): 182-190. https://www.cnki.com.cn/Article/CJFDTOTAL-GCLX201806023.htm
LI Sa, LI Tingting, ZHANG Shude. A study on pile setup based on measured in situ data[J]. Engineering Mechanics, 2018, 35(6): 182-190. (in Chinese)). https://www.cnki.com.cn/Article/CJFDTOTAL-GCLX201806023.htm
|
[7] |
杨生彬, 李友东. PHC管桩挤土效应试验研究[J]. 岩土工程技术, 2006, 20(3): 117-120. https://www.cnki.com.cn/Article/CJFDTOTAL-YTGJ200603002.htm
YANG Shengbin, LI Youdong. Experimental research on compacting effects of PHC piles[J]. Geotechnical Engineering Technique, 2006, 20(3): 117-120. (in Chinese) https://www.cnki.com.cn/Article/CJFDTOTAL-YTGJ200603002.htm
|
[8] |
水运工程基桩试验检测技术规范: JTS 240—2020[S]. 北京: 人民交通出版社, 2020.
Technical Code for Testing and Inspection of Waterway Engineering Foundation Piles: JTS 240—2020[S]. Beijing: China Communications Press, 2020. (in Chinese)
|
[9] |
曹宇春, 吴世明, 高广远. 桩基动力检测技术的现状及存在的问题[J]. 上海地质, 2002(81): 43-45. https://www.cnki.com.cn/Article/CJFDTOTAL-SHAD200201015.htm
CAO Yuchun, WU Shiming, GAO Guangyuan. Application situation of pile dynamic detections and existed problems[J]. Shanhai Geology, 2002(81): 43-45. (in Chinese) https://www.cnki.com.cn/Article/CJFDTOTAL-SHAD200201015.htm
|
[10] |
建筑基桩检测技术规范: JGJ 106—2014[S]. 北京: 中国建筑工业出版社, 2014.
Technical Code for Testing of Building Foundation Piles: JGJ 106—2014[S]. Beijing: China Architecture and Building Press, 2014. (in Chinese)
|
[11] |
梁超, 刘润. 大直径钢管桩竖向承载力计算方法研究[J]. 地下空间与工程学报, 2018, 14(1): 169-175. https://www.cnki.com.cn/Article/CJFDTOTAL-BASE201801024.htm
LIANG Chao, LIU Run. Research on evaluation methods of vertical bearing capacity for large diameter steel pipe pile[J]. Chinese Journal of Underground Space and Engineering, 2018, 14(1): 169-175. (in Chinese) https://www.cnki.com.cn/Article/CJFDTOTAL-BASE201801024.htm
|
[12] |
SVINKIN M R. Discussion on setup and relaxation in glacial sand[J]. Journal of Geotechnical Engineering, 1996, 122(4): 319-321.
|
[13] |
LONG J, KERRIGAN J, WYSOCKEY M. Measured time effects for axial capacity of driven piling[J]. Transportation Research Record Journal of the Transportation Research Board, 1999, 1663(1): 8-15.
|