• 全国中文核心期刊
  • 中国科技核心期刊
  • 美国工程索引(EI)收录期刊
  • Scopus数据库收录期刊
CAO Jie, ZHANG Ji-wen, ZHENG Jian-guo, LIANG Xiao-long, LIU Zhi, LI Pan. Design of high-fill reclamation projects in loess areas[J]. Chinese Journal of Geotechnical Engineering, 2019, 41(S1): 109-112. DOI: 10.11779/CJGE2019S1028
Citation: CAO Jie, ZHANG Ji-wen, ZHENG Jian-guo, LIANG Xiao-long, LIU Zhi, LI Pan. Design of high-fill reclamation projects in loess areas[J]. Chinese Journal of Geotechnical Engineering, 2019, 41(S1): 109-112. DOI: 10.11779/CJGE2019S1028

Design of high-fill reclamation projects in loess areas

  • With the rapid development of China's urbanization, the embankment reclamation has become an effective method to solve the bottleneck of construction land shortage, and a series of geotechnical engineering problems have arisen in these projects. Based on the existing engineering experience and literatures, the main considerations of reclamation projects are analyzed in loess areas. Considering the characteristics of loess, the precautions and design methods of foundation treatment, earth fill, slope protection and water environment control are preliminarily explained and discussed so as to provide reference for the design and research of similar projects in loess areas.
  • loading

Catalog

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return