Citation: | ZHENG Gang, WANG Qi, DENG Xu, DU Yi-ming. Comparative analysis of influences of different deformation modes of retaining structures on deformation of existing tunnels outside excavations[J]. Chinese Journal of Geotechnical Engineering, 2015, 37(7): 1181-1194. DOI: 10.11779/CJGE201507003 |
[1] |
CHANG C T, SUN C W, DUANN S W, et al. Response of a Taipei rapid transit system (TRTS) tunnel to adjacent excavation[J]. Tunnelling and Underground Space Technology, 2001, 16(3): 151-158.
|
[2] |
HWANG R N, DUANN S W, CHENG K H, et al. Damages to metro tunnels due to adjacent Excavations[C]// Proceeding of TC302 Symposium Osaka 2011: International Symposium on Backwards Problem in Geotechnical Engineering and Monitoring of Geo-Construction. Osaka, 2011: 83-88.
|
[3] |
蒋洪胜, 侯学渊. 基坑开挖对临近软土地铁隧道的影响[J]. 工业建筑, 2002, 32(5): 53-56. (JIANG Hong-sheng, HOU Xue-yuan. The influence of deep excavation on adjacent metro tunnel in soft ground[J]. Industrial Construction, 2003, 32(5): 53-56. (in Chinese))
|
[4] |
况龙川. 深基坑施工对地铁隧道的影响[J]. 岩土工程学报, 2000, 22(3): 284-288. (KUANG Long-chuan. Influence of construction of deep foundation pit on tunnels of metro[J]. Chinese Journal of Geotechnical Engineering, 2000, 22(3): 284-288. (in Chinese))
|
[5] |
刘庭金. 深基坑施工对地铁盾构隧道的影响分析[J]. 现代隧道技术, 2008(增刊1): 216-220. (LIU Ting-jin. Study on shield-bored metro tunnel deformation due to deep foundation pit construction[J]. Modern Tunnelling Technology, 2008(S1): 216-220. (in Chinese))
|
[6] |
袁 静, 刘兴旺, 陈卫林. 杭州粉砂土地基深基坑施工对邻近地铁隧道、车站的影响研究[J]. 岩土工程学报, 2012, 34(增刊): 398-403. (YUAN Jing, LIU Xing-wang, CHEN Wei-lin. Effect of construction of deep excavation in Hangzhou silty sand on adjacent metro tunnels and stations[J]. Chinese Journal of Geotechnical Engineering, 2012, 34(S0): 398-403. (in Chinese))
|
[7] |
李进军, 王卫东. 紧邻地铁区间隧道深基坑工程的设计和实践[J]. 铁道工程学报, 2011(11): 104-111. (LI Jin-jun, WANG Wei-dong. Design and construction of deep excavation engineering adjacent to the subway tunnel[J]. Journal of Railway Engineering Society, 2011(11): 104-111. (in Chinese))
|
[8] |
杨德春, 刘建国. 地铁隧道附近软土深基坑设计与施工关键技术分析[J]. 建筑结构, 2012, 42(7): 109-114. (YANG De-chun, LIU Jian-guo. Key technology analysis of soft soil deep foundation pit design and construction near the subway tunnel[J]. Building Structure, 2012, 42(7): 109-114. (in Chinese))
|
[9] |
王卫东, 沈 健, 翁其平, 等. 基坑工程对邻近地铁隧道影响的分析与对策[J]. 岩土工程学报, 2006, 28(增刊): 1340-1345. (WANG Wei-dong, SHEN Jian, WENG Qi-ping, et al. Analysis and countermeasures of influence of excavation on adjacent tunnels[J]. Chinese Journal of Geotechnical Engineering, 2006, 28(S0): 1340-1345. (in Chinese))
|
[10] |
龚晓南, 高有潮. 深基坑工程施工设计手册[M]. 北京: 中国建筑工业出版社 , 1998.(GONG Xiao-nan, GAO You-chao. Construction and design manual of deep excavation engineering[M]. Beijing: China Architecture and Building Press, 1998. (in Chinese))
|
[11] |
刘国彬, 王卫东. 基坑工程手册[M]. 2版. 北京: 中国建筑工业出版社, 2009.(LIU Guo-bin, WANG Wei-dong. Excavation engineering manual[M]. 2nd ed. Beijing: China Architecture and Building Press, 2009. (in Chinese))
|
[12] |
郑 刚, 邓 旭, 刘 畅, 等. 不同围护结构变形模式对坑外深层土体位移场影响的对比分析[J]. 岩土工程学报, 2014, 36(2): 273-285. (ZHENG Gang, DENG Xu, LIU Chang, et al. Comparative analysis of influences of different deformation modes of retaining structures on displacement field of deep soils outside excavations[J]. Chinese Journal of Geotechnical Engineering, 2014, 36(2): 273-285. (in Chinese))
|
[13] |
JGJ 120—2012 建筑基坑支护技术规程[S]. 2012. (JGJ 120—2012 Technical specification for retaining and protection of building foundation excavations[S]. 2012. (in Chinese))
|
[14] |
YB 9258—97 建筑基坑工程技术规范[S]. 1998. (YB 9258—97 Code for technique of building foundation pit engineering[S]. 1998. (in Chinese))
|
[15] |
郑 刚, 李志伟. 不同围护结构变形形式的基坑开挖对邻近建筑物的影响对比分析[J]. 岩土工程学报, 2012, 34(6): 969-977. (ZHENG Gang, LI Zhi-wei. Comparative analysis of responses of buildings adjacent to excavations with different deformation modes of retaining walls[J]. Chinese Journal of Geotechnical Engineering, 2012, 34(6): 969-977. (in Chinese))
|
[16] |
VUCETIC M, DOBRY R. Effect of soil plasticity on cyclic response[J]. Journal of Geoenvironmental Engineering, 1991, 171(1): 89-107.
|
[17] |
LEE K M, GE X M. The equivalence of a jointed shield driven tunnel lining to a continuous ring structure[J]. Journal of Canadian Geotechnical Engineering, 2001, 38: 461-483.
|
[18] |
HSIEH P G, OU C Y. Shape of ground surface settlement profiles caused by excavation[J]. Canadian Geotechnical Journal, 1998, 35(6): 1004-1017.
|
[19] |
DG/TJ08—61—2010 基坑工程技术规范[S]. 2010. (DG/TJ08—61—2010 Technical code for excavation engineering[S]. 2010. (in Chinese))
|
[20] |
王卫东, 徐中华, 王建华. 上海地区深基坑周边地表变形性状实测统计分析[J]. 岩土工程学报, 2011, 33(11): 1659-1666. (WANG Wei-dong, XU Zhong-hua, WANG Jian-hua. Statistical analysis of characteristics of ground surface settlement caused by deep excavations in Shanghai soft soils[J]. Chinese Journal of Geotechnical Engineering, 2011, 33(11): 1659-1666. (in Chinese))
|
[21] |
SCHUSTER M, KUNG G T C, JUANG C H, et al. Simplified model for evaluating damage potential of buildings adjacent to a braced excavation[J]. Journal of Geotechnical and Geoenvironmental Engineering, 2009, 135(12): 1823-1835.
|
[22] |
上海市市政工程管理局. 上海市地铁沿线建筑施工保护地铁技术管理暂行规定[Z]. 沪市政法(94) 第854号, 1994.(Shanghai Municipal Engineering Bureau. Provisional prescription on protecting techniques of metro[Z]. No. 854 of Shanghai Municipal Statute (94), 1994. (in Chinese))
|
[23] |
GB50157—2003 地铁设计规范[S]. 2003. (GB50157—2003 Code for design of metro[S]. 2003. (in Chinese))
|
[24] |
杨俊龙, 孙连元, 沈成明. 盾构机近距离穿越运营中地铁隧道施工技术研究[J]. 现代隧道技术, 2004(增刊1): 76-84. (YANG Jun-long, SUN Lian-yuan, SHEN Cheng-ming. Study on construction technology of shield tunneling under existing adjacent tunnel[J]. Modern Tunnelling Technology, 2004(S1): 76-84. (in Chinese))
|
[25] |
刘庭金. 地铁盾构隧道弯矩和变形控制值研究[J]. 隧道建设, 2010, 30(增刊1): 109-102. (LIU Ting-jin. Study on control values of bending moment and deformation of shield-bored metro tunnels[J]. Tunnel Construction, 2010, 30(S1): 109-102. (in Chinese))
|