Citation: | MENG Chang-jiang, XIONG Da-sheng, ZHAO Hai-su, ZHANG Yan, YU Ting-xin. Assessment of effect of dewatering of excavations on nearby piers of operating high-speed railways[J]. Chinese Journal of Geotechnical Engineering, 2014, 36(zk2): 265-268. DOI: 10.11779/CJGE2014S2046 |
[1] |
王连俊, 朱孝天, 张光宗. 济南西客站站房基坑降水对京沪高铁路基沉降影响分析[J]. 工程地质学报, 2012, 20(3): 459-465. (WANG Lian-jun, ZHU Xiao-tian, ZHANG Guang-zong. Analysis of subgrade settlement of Beijing-Shanghai High-speed railway due to dewatering for foundation pit at Ji-nan railway station[J]. Journal of Engineering Geology, 2012, 20(3): 459-465. (in Chinese))
|
[2] |
陈明海. 基坑开挖降水引起的地表沉降分析[D]. 杭州: 浙江大学, 2003. (CHEN Ming-hai. Analysis of settlement of ground surface induced by dewatering in excavation[D]. Hangzhou: Zhejiang University, 2003. (in Chinese))
|
[3] |
张俊霞, 李 莉, 张宝森. 基坑降水的三维渗流计算分析 [J]. 岩土工程界, 2002, 5(5): 50-51. (ZHANG Jun-xia, LI li, ZHANG Bao-sen. 3D calculation and analysis of seepage induced by dewatering in excavation[J].Geotechnical Engineering Field, 2002, 5(5): 50-51. (in Chinese))
|
[4] |
冯晓腊, 李栋广. 落底式止水帷幕条件下基坑涌漏量计算[J]. 水文地质工程地质, 2013(5): 16-21. (FENG Xiao-la, LI Dong-guang. Chung leakage quantity calculation of foundation pit on the condition of the cut-off wall insert into impermeable layer[J]. Hydrogeology & Engineering Geology, 2013(5): 16-21. (in Chinese))
|
[5] |
陈崇希, 林 敏. 地下水动力学[M]. 武汉: 中国地质大学出版社, 1999: 59-65. (CHEN Chong-xi, LIN Min. Groundwater dynamics[M]. Wuhan: Chinese Geology University Publishing House, 1999: 59-65. (in Chinese))
|