• 全国中文核心期刊
  • 中国科技核心期刊
  • 美国工程索引(EI)收录期刊
  • Scopus数据库收录期刊
蒋树屏, 胡学兵. 云南扁平状大断面公路隧道施工力学响应数值模拟[J]. 岩土工程学报, 2004, 26(2): 178-182.
引用本文: 蒋树屏, 胡学兵. 云南扁平状大断面公路隧道施工力学响应数值模拟[J]. 岩土工程学报, 2004, 26(2): 178-182.
JIANG Shuping, HU Xuebing. The numerical analysis of constructional mechanical responses of Yangzong tunnel[J]. Chinese Journal of Geotechnical Engineering, 2004, 26(2): 178-182.
Citation: JIANG Shuping, HU Xuebing. The numerical analysis of constructional mechanical responses of Yangzong tunnel[J]. Chinese Journal of Geotechnical Engineering, 2004, 26(2): 178-182.

云南扁平状大断面公路隧道施工力学响应数值模拟

The numerical analysis of constructional mechanical responses of Yangzong tunnel

  • 摘要: 结合昆明-古林高速公路上的阳宗隧道的设计和地质情况,对软弱围岩条件下的扁平状大断面公路隧道采用不同方法施工时的力学响应进行了数值模拟,分析了围岩和支护结构体非线性力学行为的地应力场、位移场,确定了适合于大断面公路隧道的合理施方法。

     

    Abstract: According to the design and geological condition of Yangzong tunnel, which lies on the highway of Kunming-Shilin,numerical methods used to analyze the mechanical responses of flat big segment highway tunnel on soft rock. Then the stress field and displacement field induced by the nonlinear mechanical action of different constructional methods are studied, and the rational construction method of big segment highway tunnel is determined.

     

/

返回文章
返回