李磊, 张孟喜, 吴惠明, 王永佳. 近距离多线叠交盾构施工对既有隧道变形的影响研究[J]. 岩土工程学报, 2014, 36(6): 1036-1043. DOI: 10.11779/CJGE201406007
引用本文: 李磊, 张孟喜, 吴惠明, 王永佳. 近距离多线叠交盾构施工对既有隧道变形的影响研究[J]. 岩土工程学报, 2014, 36(6): 1036-1043. DOI: 10.11779/CJGE201406007
LI Lei, ZHANG Meng-xi, WU Hui-ming, WANG Yong-jia. Influence of short-distance multi-line overlapped shield tunnelling on deformation of existing tunnels[J]. Chinese Journal of Geotechnical Engineering, 2014, 36(6): 1036-1043. DOI: 10.11779/CJGE201406007
Citation: LI Lei, ZHANG Meng-xi, WU Hui-ming, WANG Yong-jia. Influence of short-distance multi-line overlapped shield tunnelling on deformation of existing tunnels[J]. Chinese Journal of Geotechnical Engineering, 2014, 36(6): 1036-1043. DOI: 10.11779/CJGE201406007

近距离多线叠交盾构施工对既有隧道变形的影响研究

Influence of short-distance multi-line overlapped shield tunnelling on deformation of existing tunnels

  • 摘要: 针对上海地铁新建11号线先下后上近距离穿越既有4号线,形成三层隧道四线叠交的特殊工况,采用有限元数值模拟和现场监测相结合的方法,考虑既有隧道周围土压力的分布规律,研究了盾构下穿施工时土仓压力和注浆压力以及上穿施工时压重范围和压重量对既有隧道变形的影响。研究结果表明:下穿施工结束时,既有隧道的沉降量不随土仓压力比的改变而改变,但随注浆压力比的减小而增大;上穿施工应采取压重措施预防既有隧道的上浮和局部隆起变形,宜遵循新建隧道同步压重为主,既有隧道压重为辅的原则。

     

    Abstract: Considering the complicated project of four-line overlapped tunnels in Shanghai metro construction, in which Metro Line 11 below-shield and above-shield crosses the existing Metro Line 4 successively, numerical modelling and in-situ monitoring are employed to study the influence of shield tunnelling on the deformation of the existing tunnels. According to the distribution law of earth pressure around the existing tunnels, the shield operation parameters are set to change with the advance of the EPB shield machine. Particular attention is paid to the effect of the chamber earth pressure and grouting pressure on the deformation of the existing tunnels during the below-shield tunnelling as well as the loading scope and its value during the above-shield tunnelling. The results show that the settlement of the existing tunnels stays at the same level as the chamber earth pressure ratio increases, while it increases with the decrease of the grouting pressure ratio. Construction measures, which follow the principle of synchronous loading in the new tunnel mainly and loading in the existing tunnel secondarily, should be taken to control the heave and partial uplift of the existing tunnels during the above-shield tunnelling.

     

/