沙漠地区电气化铁路接触网支柱基础现场试验
Field Measurement on Foundation of Pillar Supporting Power Contact Network of Railway in Desert Region
-
摘要: 对包兰线中卫—干塘段电气化铁路的4种接触网支柱基础进行了土压力和位移实测。指出三种支柱基础满足稳定性要求。提出了节约混凝土圬工数量的方法和增加基础稳定性所要采取的措施。Abstract: The earth pressures and displacements for four types of foundations of pillars supporting power contact network are measured in situ in Zhongwei Gantang Section along Baotou Lanzhou Railway. Three of them are considered to be stable according to the measured results. And the methods saving concrete masonry quantity and strengthening the stability of pillar foundation are given in the paper.