尾矿坝埋管土压力研究
Research on Soil Pressure of Buried pipes in Tailing Dam
-
摘要: 本文结合尾矿坝的结构和填筑特点,采用非线性有限元法研究埋管土压力与岸坡倾角、山谷底宽、埋管断面形式及埋设方式等因素的关系及其变化规律,为尾矿坝埋管设计提供了有价值的资料。Abstract: According to the structure and filling characters of the tailing dam,the nonlinear finite element method isused to investigate the relations between the soil pressure and the dip angle of slope,width of the valley,cross sec-tion of the pipe as well as the installation type.The results can be used in buried pipe design of the tailling dam.