• 全国中文核心期刊
  • 中国科技核心期刊
  • 美国工程索引(EI)收录期刊
  • Scopus数据库收录期刊
刘麟德. 深厚覆盖层坝基施工期模型试验及数值分析[J]. 岩土工程学报, 1983, 5(2): 45-59.
引用本文: 刘麟德. 深厚覆盖层坝基施工期模型试验及数值分析[J]. 岩土工程学报, 1983, 5(2): 45-59.
Liu Linde. Numerical Analysis and Model Tests during Construction of a Dam Foundation Built on the Deep Alluvion[J]. Chinese Journal of Geotechnical Engineering, 1983, 5(2): 45-59.
Citation: Liu Linde. Numerical Analysis and Model Tests during Construction of a Dam Foundation Built on the Deep Alluvion[J]. Chinese Journal of Geotechnical Engineering, 1983, 5(2): 45-59.

深厚覆盖层坝基施工期模型试验及数值分析

Numerical Analysis and Model Tests during Construction of a Dam Foundation Built on the Deep Alluvion

  • 摘要: 本文论述了一座水电站河谷右深槽覆盖层坝基施工期地基模型试验。模型试验实测沉降量与用分层总和法、数值分析法计算结果接近。通过模型试验得出了坝基的最大承载力,还进行了施工方法的模型试验,验证了设计方案。大量的试验资料还表明,用电测百分表和液压千斤顶稳压器效果良好。

     

    Abstract: In this paper the model testing during construction of the dam foundation built on right deep alluvion of the river valleys for a Hydroelectric power station are described. The settlement data of model tests are in general agreement with the calculated values on models of numerical analysis. The values of the settlement are approximation with calculated value of summating for each layer and calculated values on prototype of numerical analysis. Therefore, this method is very feasible.Maximum bearing capacity of the dam foundation has been obtained from the model tests during construction. The model tests of construction methods are proceed, which may be tested and verified calculating of designing plan.A large number of experimental data also indicated that the effects of an electric dial gage and a hydraulic jack stabilizator are very good.

     

/

返回文章
返回