刘世明, 胡宏磊, 陈鼎. 天荒坪抽水蓄能电站岔管区域高压渗透试验[J]. 岩土工程学报, 1996, 18(6): 35-42.
引用本文: 刘世明, 胡宏磊, 陈鼎. 天荒坪抽水蓄能电站岔管区域高压渗透试验[J]. 岩土工程学报, 1996, 18(6): 35-42.
Liu Shi ming, Hu Hong lei, Chen Ding. High  Pressure  Permeability  Test  at  Tianhuangping    Pumped  Storage  Power  Station[J]. Chinese Journal of Geotechnical Engineering, 1996, 18(6): 35-42.
Citation: Liu Shi ming, Hu Hong lei, Chen Ding. High  Pressure  Permeability  Test  at  Tianhuangping    Pumped  Storage  Power  Station[J]. Chinese Journal of Geotechnical Engineering, 1996, 18(6): 35-42.

天荒坪抽水蓄能电站岔管区域高压渗透试验

High  Pressure  Permeability  Test  at  Tianhuangping    Pumped  Storage  Power  Station

  • 摘要: 天荒坪高压渗透试验旨在揭示高压岔管所在岩体在高内水压力作用下的稳定和渗透性,以论证可否建造高压钢筋混凝土岔管,并为设计提供允许水力坡降、渗水量、地应力参数及为工程措施提供依据。3只试验孔的试验结果表明,岔管区域总体上环境地应力足够高,但是,2#岔管附近存在地应力低、渗水量大的局部岩体,需采取工程措施加以改善

     

    Abstract: High  pressure  permeability  test  in  a  drillhole  at  Tianhuangping  was  carried  out  as  feasibility  studies  for  manifolds  with  no  steel  lining.    The  maximum  testing  pressure  was  10MPa.    Test  results  show  that  the  average  initial  stresses  in  the  rock  are  great  enough  to  build  a  manifold  with  no  steel  linig.    But  in  some  places,  the  stresses  are  not  great  enough  and  the  leakage  through  the  surrounding  rock  mass  is  rather  great.    So  proper  measures  should  be  taken  to  improve  the  situation.

     

/