[1] |
BYRNE R J, COTTON D, PORTERFIED J, et al. Manual for design and construction monitoring of soil nail walls(FHWA-SA-96-069R)[M]. Washington D C: Federal Highway Administration, 1998.
|
[2] |
陈肇元, 崔京浩. 土钉支护在基坑工程中的应用[M]. 2版. 北京: 中国建筑工业出版社, 2000. (CHEN Zhao-yuan, CUI Jin-hao. Application of soil nail wall in deep excavation[M]. 2nd ed. Beijing: China Architecture and Building Press, 2000. (in Chinese))
|
[3] |
JGJ 120—99建筑基坑支护技术规程[S]. 北京: 中国建筑工业出版社, 1999. (JGJ120—99 Technical specification for retaining and protection of building foundation excavations[S]. Beijing: China Architecture and Building Press, 1999. (in Chinese))
|
[4] |
JGJ 167—2009 湿陷性黄土地区建筑基坑工程安全技术规程[S]. 北京: 中国建筑工业出版社, 2009. (JGJ 167—2009 Technical specifications for safe retaining and protection of building foundation excavation engineering in collapsible loess regions[S]. Beijing: China Architecture and Building Press, 2009. (in Chinese))
|
[5] |
GB 50330—2002建筑边坡工程技术规范[S]. 北京: 中国建筑工业出版社, 2002. (GB 50330—2002 Technical code for building slope engineering[S]. Beijing: China Architecture and Building Press, 2002. (in Chinese))
|
[6] |
朱彦鹏, 叶帅华, 莫 庸. 青海省西宁市某深基坑事故分析[J]. 岩土工程学报, 2010, 32(增刊1): 404-409. (ZHU Yan-peng, YE Shuai-hua, MO Yong. Analysis and treatment of a deep foundation pit accident in Xining, Qinghai Province[J]. Chinese Journal of Geotechnical Engineering, 2010, 32(S1): 404-409. (in Chinese))
|
[7] |
叶帅华, 朱彦鹏, 周 勇. 兰州市某复杂深基坑工程设计与监测分析[J]. 岩土工程学报, 2011, 33(增刊1): 431-437. (YE Shuai-hua, ZHU Yan-peng, ZHOU Yong. Design and monitoring analysis of a complicated deep excavation engineering in Lanzhou[J]. Chinese Journal of Geotechnical Engineering, 2011, 33(S1): 431-437. (in Chinese))
|
[8] |
张明聚, 宋二祥, 陈肇元. 基坑土钉支护稳定分析方法及其应用[J]. 工程力学, 1998, 15(3): 36-43. (ZHANG Ming-ju, SONG Er-xiang, CHEN Zhao-yuan. Method of stability analysis in deep excavation and its application[J]. Engineering Mechanics, 1998, 15(3): 36-43. (in Chinese))
|
[9] |
朱彦鹏, 王秀丽, 张贵文, 等. 兰州中广大厦超长深基坑支护的设计、施工与实验监测[J]. 工程力学, 2002, 19(增刊): 336-341. (ZHU Yan-peng, WANG Xiu-li, ZHANG Gui-wen, et al. Design, construction and experimental monitoring of lengthy deep foundation in Zhongguang Highrise Building of Lanzhou[J]. Engineering Mechanics, 2002, 19(S0): 336-341. (in Chinese))
|
[10] |
朱彦鹏, 李 忠. 边坡土钉墙支护稳定性分析方法的改进及软件开发[J]. 岩土工程学报, 2005, 26(8): 939-943. (ZHU Yan-peng, LI Zhong. Improvement on stability analysis of soil nail in foundation excavations and its software development design[J]. Chinese Journal of Geotechnical Engineering, 2005, 26(8): 939-943. (in Chinese))
|
[11] |
朱彦鹏, 王秀丽, 李 忠, 等. 土钉墙的一种可靠性自动优化设计法. 岩石力学与工程学报, 2006, 25(增刊1): 3123-3130. (ZHU Yan-peng, WANG Xiu-li, LI Zhong, et al. An optimal design method of reliability for soil nailed walls[J]. Chinese Journal of Rock Mechanics and Engineering, 2006, 25(S1): 3123-3130. (in Chinese))
|