Abstract:
According to different surrounding building conditions, the forming process of diaphragm wall trench construction in water-rich sand stratum is analyzed by means of the method of finite element numerical simulation. In the process, the module of simulating mud is used. According to the calculated results, the mutual influence of different buildings and diaphragm wall trench construction is investigated. The effects of reinforcement measures are also analyzed, and the relevant rules are obtained.