大型水电站导流洞围岩稳定分析
Rock stabilization analysis of diversion tunnel of a large-scale hydropower station
-
摘要: 使用子模型方法和有限元模拟技术,考虑岩石的非线性特性,有机的将大范围的初始应力场和局部的导流洞开挖进程中的二次应力场联系在一起,全面的分析洞室形成过程中洞室围岩的稳定性。采用此方法对一大型水电站的左、右岸导流洞围岩稳定进行计算和分析,为洞室结构设计提供有效的数值参考。Abstract: The sub-model skill and finite element method were used.Considering the nonlinear characteristic of rock,the global initial stress and the secondary stress of the excavation of the diversion tunnel could be combined.At the same time,construction procedure was considered.Using these methods,the stabilization of the diversion of a large-scale hydropower station was analyzed.According to the result,the designer could make a more rational tunnel structure.