河下开采扰动诱致采空区动态失稳定量预计与综合评价
Quantitative prediction and comprehensive evaluation on dynamic destabilization of LSMA due to excavation disturbance underneath river
-
摘要: 水下开采扰动区内安全开采是个复杂的问题,地应力改变及采空区围岩介质断裂失稳为一个动态过程,具有明显的时间效应特征,其不仅直接受到动态破坏,还受后续开采扰动的累积响应。采用多种实验和分析方法,对开采引起的覆岩断裂破坏和地表移动规律进行定量化预计与综合评价,在维持西天河现状、现有开采方法和开拓方式的前提下,实现了L3414综采工作面河下控水采煤。Abstract: The complexity of safe mining arised from two aspects due to excavation disturbed zone(EDZ) underneath water.One was the re-distributed ground stress;whilst the other was the dynamic behaviour of a mining-rock mass system,and damages were closely related to the mining process and time dependent.The cracks and damage of overburden rock-mass in the large scale mined-out area(LSMA) were not only the direct and instant response but also the accumulated dynamic response of a rock mass disturbed by mining activities.Based on in-situ experiment and analysis,the dynamic destabilization of the large scale mined-out area(LSMA) and ground subsidence were determined quantitatively;whilst the safe mining and the induced environmental hazard were comprehensively evaluated in the excavation disturbed zone.Under the condition of preserving the existing river and using the present mining method,the lagged reserves had been mined successfully.