张治国, 陈杰, 朱正国, 魏纲, 吴钟腾, 陆正. 基于Kerr地基模型的盾构下穿诱发既有非连续隧道纵向变形分析[J]. 岩土工程学报, 2023, 45(11): 2238-2247. DOI: 10.11779/CJGE20221012
引用本文: 张治国, 陈杰, 朱正国, 魏纲, 吴钟腾, 陆正. 基于Kerr地基模型的盾构下穿诱发既有非连续隧道纵向变形分析[J]. 岩土工程学报, 2023, 45(11): 2238-2247. DOI: 10.11779/CJGE20221012
ZHANG Zhiguo, CHEN Jie, ZHU Zhengguo, WEI Gang, WU Zhongteng, LU Zheng. Longitudinal deformations of existing discontinuous tunnels induced by shield tunneling based on Kerr foundation model[J]. Chinese Journal of Geotechnical Engineering, 2023, 45(11): 2238-2247. DOI: 10.11779/CJGE20221012
Citation: ZHANG Zhiguo, CHEN Jie, ZHU Zhengguo, WEI Gang, WU Zhongteng, LU Zheng. Longitudinal deformations of existing discontinuous tunnels induced by shield tunneling based on Kerr foundation model[J]. Chinese Journal of Geotechnical Engineering, 2023, 45(11): 2238-2247. DOI: 10.11779/CJGE20221012

基于Kerr地基模型的盾构下穿诱发既有非连续隧道纵向变形分析

Longitudinal deformations of existing discontinuous tunnels induced by shield tunneling based on Kerr foundation model

  • 摘要: 目前针对盾构开挖诱发既有隧道结构变形的理论研究一般将既有隧道视为搁置在Winkler地基上的Euler-Bernoulli梁,未充分考虑地基的非线性剪切变形及管片剪切变形的影响,尤其是较少考虑隧道环缝接头存在所带来的力学效应作用。首先,采用Loganathan和Poulos公式计算得到盾构下穿开挖引起既有隧道轴线处土体竖向位移;然后,将既有隧道视为由环缝接头连接而成的Timoshenko梁,并将其搁置在Kerr地基模型上,采用有限差分法计算得到既有隧道纵向变形;最后,采用工程监测数据与理论解进行对比验证,得到了较好的一致性。此外,针对土层弹性模量、既有隧道等效抗弯刚度和等效抗剪刚度进行了参数分析。分析结果表明,随着土体弹性模量的增大及既有隧道等效抗弯刚度的减小,既有隧道位移、环缝接头相对转角、管片及环缝接头处弯矩均增大;随着既有隧道等效抗剪刚度的增大,既有隧道位移减小,而环缝接头相对转角、管片及环缝接头处弯矩均增大;环缝接头相对转角、管片及环缝接头处弯矩随着与新建隧道轴线距离的增大呈先减小后增大趋势;当既有隧道环缝接头刚度折减系数增大时,管片及环缝接头处弯矩均增大,而隧道位移及环缝接头相对转角减小。

     

    Abstract: At present, the theoretical researches on the structural deformation of the existing tunnels induced by shield excavation generally regard the existing tunnels as the Euler Bernoulli beam resting on the Winkler foundation without taking into account the effects of non-linear shear deformation of the foundations and shear deformation of the segments, especially the mechanical effects of the existence of circumferential joints of the tunnels. Firstly, the Loganathan and Poulos formula is used to calculate the vertical displacements of soils at the axis of the existing tunnel caused by shield under-crossing excavation. Then, the existing tunnel is regarded as a Timoshenko beam connected by circumferential joints and resting on the Kerr foundation model. The finite difference method is used to calculate the longitudinal deformations of the existing tunnel. Finally, the engineering monitoring data are used to compare and verify the theoretical solutions by the proposed method, and a good agreement is obtained. In addition, the parameter analysis is carried out for the stiffness influence parameters of elastic modulus of soil layer, equivalent bending stiffness and equivalent shear stiffness of the existing tunnel. The results of the analysis show that with the increase in the modulus of elasticity of the soil and the decrease in the equivalent flexural stiffness of the existing tunnel, the displacements of the existing tunnel, the relative turning angles of the circumferential joint and the bending moments at the segment and circumferential joint increase. As the equivalent shear stiffness of the existing tunnel increases, the displacements of the existing tunnel decrease, while the relative turning angles of the circumferential joint and the bending moments at the segment and circumferential joint increase. The relative turning angles of the circumferential joint and the bending moments at the segment and circumferential joint tend to decrease and then increase with the increasing distance from the axis of the new tunnel. When the stiffness discount factor of the circumferential joint of the existing tunnel increases, the bending moments at both the segment and circumferential joint increase, while the tunnel displacements and relative turning angles of the circumferential joint decrease.

     

/