• 全国中文核心期刊
  • 中国科技核心期刊
  • 美国工程索引(EI)收录期刊
  • Scopus数据库收录期刊
肖明清, 封坤, 周子扬, 刘伊腾, 鲁志鹏. 盾构隧道施工期管片错台影响因素研究[J]. 岩土工程学报, 2023, 45(7): 1347-1356. DOI: 10.11779/CJGE20220462
引用本文: 肖明清, 封坤, 周子扬, 刘伊腾, 鲁志鹏. 盾构隧道施工期管片错台影响因素研究[J]. 岩土工程学报, 2023, 45(7): 1347-1356. DOI: 10.11779/CJGE20220462
XIAO Mingqing, FENG Kun, ZHOU Ziyang, LIU Yiteng, LU Zhipeng. Study on the influencing factors for segment dislocation during shield tunnelling[J]. Chinese Journal of Geotechnical Engineering, 2023, 45(7): 1347-1356. DOI: 10.11779/CJGE20220462
Citation: XIAO Mingqing, FENG Kun, ZHOU Ziyang, LIU Yiteng, LU Zhipeng. Study on the influencing factors for segment dislocation during shield tunnelling[J]. Chinese Journal of Geotechnical Engineering, 2023, 45(7): 1347-1356. DOI: 10.11779/CJGE20220462

盾构隧道施工期管片错台影响因素研究

Study on the influencing factors for segment dislocation during shield tunnelling

  • 摘要: 为分析盾构隧道施工期各因素对管片上浮错台的影响,基于盾构隧道施工期的受力模式拟定了隧道直径、围岩条件、覆土厚度、浆液凝固时间、浆液密度、盾构掘进速度及盾尾间隙等7个主要影响因素,分别建立了盾构隧道施工期上浮分析模型与管片错台量计算模型,分析了施工期各因素影响下盾构隧道上浮错台量的变化规律。进一步地,结合现场监测试验结果,验证了施工期管片上浮错台的现象与规律,得出主要结论如下:①地层刚度减弱、浆液密度增大、浆液凝固时间增长、隧道埋深减小、隧道掘进速度提高、盾尾间隙增大及浆液凝固后刚度减小将加剧施工期管片的上浮错台。②隧道直径增大使管片上浮量增大,但与管片错台量的相关性不大。③管片上浮时,管片环间接触摩擦与环间螺栓将起到抗剪作用,控制错台的发展。④减小浆液浮力、增大管片环间连接刚度、增强地层约束、缩短流体段长度可减小施工期管片上浮错台。⑤提出计算错台量的方法可对管片接缝防水设计提供依据。

     

    Abstract: In order to analyze the influences of various factors during the construction period of a shield tunnel on the uplifting dislocation of segments, seven influencing factors are proposed according to the mechanical state, including outer diameter of the tunnel, ground condition, cover depth, coagulation time and density of synchronous grouts, shield tunneling speed and shield tail clearance. Numerical models for tunnel uplifting and segment dislocation are established to investigate the dislocation under different influencing factors. Then the variation laws of the segment dislocation are analyzed under the influences of various factors during the construction period. Moreover, the phenomenon and laws of the segment dislocation during shield tunnelling are verified through the test results of on-site monitoring. The main conclusions are as follows: (1) The segment dislocation will be intensified when the ground stiffness weakens, the density of synchronous grout increases, the coagulation time of synchronous grouts grows, the cover depth decreases, the tunneling speed increases, the shield tail clearance increases, and the grout stiffness after solidification decreases. (2) The increase of the tunnel diameter will lead to the increase of the segment uplifting, but has little correlation with the segment dislocation. (3) When the segment is uplifting, the contact friction between the segment rings and the bolt between the rings will play the role of shear resistance to control the dislocation. (4) Decreasing the uplifting force of the grouts, increasing the connection stiffness between the segments and the rings, strengthening the formation constraint and shortening the length of the fluid segment can reduce the segment uplifting dislocation during construction. (5) The proposed method to calculate the amount of dislocation can be used as a reference for the longitudinal waterproof design of segments.

     

/