• 全国中文核心期刊
  • 中国科技核心期刊
  • 美国工程索引(EI)收录期刊
  • Scopus数据库收录期刊
李亚东, 周金雯, 单毅, 崔杰, 魏立新. P波入射下考虑基槽回填材料的沉管隧道抗震分析[J]. 岩土工程学报, 2023, 45(6): 1190-1199. DOI: 10.11779/CJGE20220249
引用本文: 李亚东, 周金雯, 单毅, 崔杰, 魏立新. P波入射下考虑基槽回填材料的沉管隧道抗震分析[J]. 岩土工程学报, 2023, 45(6): 1190-1199. DOI: 10.11779/CJGE20220249
LI Yadong, ZHOU Jinwen, SHAN Yi, CUI Jie, WEI Lixin. Seismic response analysis of immersed tunnels considering backfill materials of foundation under incidence of P waves[J]. Chinese Journal of Geotechnical Engineering, 2023, 45(6): 1190-1199. DOI: 10.11779/CJGE20220249
Citation: LI Yadong, ZHOU Jinwen, SHAN Yi, CUI Jie, WEI Lixin. Seismic response analysis of immersed tunnels considering backfill materials of foundation under incidence of P waves[J]. Chinese Journal of Geotechnical Engineering, 2023, 45(6): 1190-1199. DOI: 10.11779/CJGE20220249

P波入射下考虑基槽回填材料的沉管隧道抗震分析

Seismic response analysis of immersed tunnels considering backfill materials of foundation under incidence of P waves

  • 摘要: 沉管隧道基槽回填是沉管隧道施工中的重要工序,而其对沉管隧道的抗震减震性能影响规律在现有研究中鲜有提及。为探究沉管隧道柔性接头在不同回填材料刚度下的位移量,基于多质点-弹簧-梁模型,结合纵向反应位移法,运用考虑纵向限位装置的柔性接头轴向受力分析模型,以广州市如意坊沉管隧道为背景,开展P波入射下的纵向动力响应分析数值试验。计算结果表明:数值模型与计算方法能够得到合理的场地与结构响应;采用纵向反应位移法进行计算分析时应提取自由场中隧道截面对应位置处的多点位移时程作为结构的激励;未经处理的淤泥质软黏土不能作为基槽回填材料,将砂土或砾石作为基槽回填材料时,若增大其密实度,其抗震能力可获得进一步提高。该研究结果可为沉管隧道在地震作用下的响应分析与抗震设计提供更为可靠完善的计算模型与设计依据。

     

    Abstract: The backfilling of foundation groove of immersed tunnels is an important procedure in the construction, but the influence mechanism of its seismic performance is seldomly mentioned in the previous researches. In order to investigate the influences of the stiffness of backfill materials on the deformation of flexible joints in the immersed tunnels, the numerical tests of longitudinal dynamic response analysis under incidence of P waves are carried out for Ruyifang immersed tunnel in Guangzhou by using the particle-spring-beam model with implementation of the longitudinal displacement method and the flexible joint model with the longitudinal limit devices. The results show that the numerical model and method can make the structures respond in a timely and reasonable manner. When the longitudinal response displacement method is used for calculation and analysis, the time histories of multi-point displacement in the free field should be extracted as the excitation of the structures. The untreated soft silt clay cannot be used as the backfill materials. If the density of sand or gravel is increased, the seismic capacity will be further improved. The research results may provide a more reliable model and design basis for the response analysis and seismic design of immersed tunnels under earthquakes.

     

/

返回文章
返回