港珠澳大桥沉管隧道瞬时沉降规律分析
Instantaneous settlement of immersed tube tunnel of Hong Kong-Zhuhai-Macao Bridge
-
摘要: 跨海通道沉管隧道的沉降对其施工质量和运行安全的影响非常大。针对港珠澳大桥沉管隧道的深水载荷试验、现场模型试验及现场实测数据进行,对沉管隧道沉降现象及规律进行了总结归纳,探讨沉降的组成及机理。并结合不同管节理论计算成果,论证了沉管隧道瞬时沉降的关键影响因素。通过对监测数据分析及论证,明确瞬时沉降是海底沉管隧道沉降的重要组成部分,分析了其对沉管隧道工程的影响,建议了瞬时沉降计算方法,为今后沉管隧道工程设计施工提供借鉴。Abstract: The settlement of immersed tube tunnel is very important to its construction quality and safety. The definition and mechanism of instantaneous settlement of immersed tube tunnel are summarized by deep-water load plate tests, model tests and field measurements. The key influencing factors and mechanisms are demonstrated by combining the theoretical results of different pipe joints. Through the analysis of the monitoring data, the main role of instantaneous settlement in the settlement and its influences on the immersed tube tunnel are clarified. The research results may provide reference for the design and construction of immersed tunnel projects in the future.